Demolition and cut over of old D20 SCADA system, Annunciator, Alarms, supervisory controls and analogs to new standardized SCADA system.Multiple Outages staged systematically to cut over 320P Substation until the entire substation complete. Demolition of metering transducers and installation of new SCADA meters.Demolition and cut over of old station LAN and IRIG-B clocks to new standard LAN equipment and IRIG-B clocks
Demolition and cut over of old D20 SCADA system, Annunciator, Alarms, supervisory controls and analogs to new standardized SCADA system.
Multiple Outages staged systematically to cut over 320P Substation until the entire substation complete.
Demolition of metering transducers and installation of new SCADA meters.
Demolition and cut over of old station LAN and IRIG-B clocks to new standard LAN equipment and IRIG-B clocks
De-coupling of Substation Mimic board located in TAU plant
FNE Station Replacement Project
Location:
BC Hydro Natal & Eiko Substations
End User:
BC Hydro/AMEC
Year/ Duration:
2017-2018 / 3mos
Scope of Work:
60kV Line Protection replacements including Testing & Commissioning
FNE Station Replacement Project
Location:
BC Hydro Natal & Eiko Substations
End User:
BC Hydro/AMEC
Year/ Duration:
2017-2018 / 3mos
Scope of Work:
60kV Line Protection replacements including Testing & Commissioning
Manitoba Hydro Bi-pole 3 Project 500kV HVDC
Location:
Riel Station, Winnipeg
End User:
Siemens AG & Mortenson Construction
Year/ Duration:
2017-2018
Scope of Work:
Equipment pre-commissioning for HVDC yard, 240kV AC filter banks, DC Charger and UPS systems, and low voltage auxiliary power systems. Coordination with construction to assist in the gas filling for HVDC voltage dividers. Client Support with energization procedures, switching, and LOTO of LV auxiliary power system.
Manitoba Hydro Bi-pole 3 Project 500kV HVDC
Location:
Riel Station, Winnipeg
End User:
Siemens AG & Mortenson Construction
Year/ Duration:
2017-2018
Scope of Work:
Equipment pre-commissioning for HVDC yard, 240kV AC filter banks, DC Charger and UPS systems, and low voltage auxiliary power systems.
Coordination with construction to assist in the gas filling for HVDC voltage dividers.
Client Support with energization procedures, switching, and LOTO of LV auxiliary power system.
BMT Load Capacity Increase Project
Location:
BC Hydro Bear Mountain Terminal Substation
End User:
BC Hydro / SNC Lavalin
Year/ Duration:
2017
Scope of Work:
Provide on-site Technical support for installation of 4 230/138kV Circuit Breaker/Disconnects, 230/138kV 150MVA Transformer, 138kV 30MVar Capacitor Bank.Testing & Commissioning of all new and modified Protection & Control, SCADA and Automation systems and equipment.
BMT Load Capacity Increase Project
Location:
BC Hydro Bear Mountain Terminal Substation
End User:
BC Hydro / SNC Lavalin
Year/ Duration:
2017
Scope of Work:
Provide on-site Technical support for installation of 4 230/138kV Circuit Breaker/Disconnects, 230/138kV 150MVA Transformer, 138kV 30MVar Capacitor Bank.
Testing & Commissioning of all new and modified Protection & Control, SCADA and Automation systems and equipment.
Complete SCADA Upgrade / Replacement
Location:
AltaLink 89S Ellersile
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Demolition and cut over of old D20 SCADA system, Annunciator, Alarms, supervisory controls and analogs to new standardized SCADA system. Multiple Outages staged systematically to cut over 89S Substation until the entire substation complete. Demolition of mimic board and metering transducers, replacement of 240KV Airbreak control modules. Installation of new SCADA meters.Demolition and cut over of old station LAN and IRIG-B clocks to new standard LAN equipment and IRIG-B clocks
Demolition and cut over of old D20 SCADA system, Annunciator, Alarms, supervisory controls and analogs to new standardized SCADA system.
Multiple Outages staged systematically to cut over 89S Substation until the entire substation complete.
Demolition of mimic board and metering transducers, replacement of 240KV Airbreak control modules. Installation of new SCADA meters.
Demolition and cut over of old station LAN and IRIG-B clocks to new standard LAN equipment and IRIG-B clocks
Replacement of old DDR’s to new standard DDR’s
Full Green Field Commissioning of Hazelwood Substation Demo/Install of line/Transformer/Bus Protection in Remote Ends Testing and Commissioning of all Major Equipment Testing and Commissioning of all P&C and SCADA Equipment
Full Green Field Commissioning of Hazelwood Substation
Demo/Install of line/Transformer/Bus Protection in Remote Ends
Testing and Commissioning of all Major Equipment
Testing and Commissioning of all P&C and SCADA Equipment
End to End Testing and Energization Support
SCADA Upgrade / Urgent Replacement
Location:
AltaLink 395S North Holden
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Urgent replacement/retrofit of failed of failed D20++ with a D20 EME
SCADA Upgrade / Urgent Replacement
Location:
AltaLink 395S North Holden
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Urgent replacement/retrofit of failed of failed D20++ with a D20 EME
RATD Phase 3
Location:
AltaLink Ellis 332s
End User:
SNC
Year/ Duration:
2017
Scope of Work:
Transmission line addition and lines swappedBus Protection upgrade138KV dead tank breaker commissioningAirbreak and Surge Arresters commissioning
Transmission line addition and lines swapped
Bus Protection upgrade
138KV dead tank breaker commissioning
Airbreak and Surge Arresters commissioning
Testing and Commissioning of all P&C and SCADA Equipment
GPS End to End Relay Testing and Energization Support
Complete SCADA Upgrade / Replacement
Location:
AltaLink 793s Horse Creek
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Demolition and cut over of old D20 SCADA system, Annunciator, Alarms & supervisory controls to new standardized SCADA system.Multiple Outages staged systematically to cut over 793s Substation until the entire substation and integration with IPL plant was complete.T1, T2, & T3 Airbreak control modules, and meter transducers were upgraded. Existing 138 Bus differential upgraded from High impedance protection to new digital differential protection.
Demolition and cut over of old D20 SCADA system, Annunciator, Alarms & supervisory controls to new standardized SCADA system.
Multiple Outages staged systematically to cut over 793s Substation until the entire substation and integration with IPL plant was complete.
T1, T2, & T3 Airbreak control modules, and meter transducers were upgraded.
Existing 138 Bus differential upgraded from High impedance protection to new digital differential protection.
65s High River 25kV Breaker Replacements
Location:
AltaLink 65s High River
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Coordination with AML substation crews to assist in the P&C changes and Equipment commissioning for the replacements of Qty - 4 25kV Outdoor Circuit Breakers.
65s High River 25kV Breaker Replacements
Location:
AltaLink 65s High River
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Coordination with AML substation crews to assist in the P&C changes and Equipment commissioning for the replacements of Qty - 4 25kV Outdoor Circuit Breakers.
SCADA Upgrade / Urgent Replacement
Location:
AltaLink 395S North Holden
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Urgent replacement/retrofit of failed of failed D20++ with a D20 EME
SCADA Upgrade / Urgent Replacement
Location:
AltaLink 395S North Holden
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Urgent replacement/retrofit of failed of failed D20++ with a D20 EME
352s Onoway 69kV Breaker Replacement
Location:
AltaLink 352s Onoway
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Coordination with AML scheduling / AML Mobile Sub Crew/ Construction and Commissioning for the installation of the Mobile SubstationSalvage of existing 69kV Bulk Oil breaker and installation of new Mitsubishi 69kV Dead Tank BKR. Salvage and Replacement of existing 69kV Hook switches Installation of new Line Side Surge Arrestors.
Coordination with AML scheduling / AML Mobile Sub Crew/ Construction and Commissioning for the installation of the Mobile Substation
Salvage of existing 69kV Bulk Oil breaker and installation of new Mitsubishi 69kV Dead Tank BKR.
Salvage and Replacement of existing 69kV Hook switches
Installation of new Line Side Surge Arrestors.
Demolition and Modifications to existing P&C wiring and SCADA.
649s Full Metering Upgrade
Location:
AltaLink 649s Chapice Lake
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Addition of Single Phase 138kV Metering PT to change existing revenue metering scheme from a 2 PT Metering Method to 3 phase Metering Method. Energization support – Load Readings / Phasing Checks
649s Full Metering Upgrade
Location:
AltaLink 649s Chapice Lake
End User:
AltaLink
Year/ Duration:
2017
Scope of Work:
Addition of Single Phase 138kV Metering PT to change existing revenue metering scheme from a 2 PT Metering Method to 3 phase Metering Method.
Energization support – Load Readings / Phasing Checks
Keewatinohk AC Yard Pre-Commissioning
Location:
Keewatinohk Converter Station AC Yard
End User:
SNC
Year/ Duration:
2017
Scope of Work:
Full Green Field Pre-Commissioning of AC Yard Testing of All Major Equipment in AC YardTesting of Two 13.8kV Switchgear Buildings Testing of Three 600V OPC Buildings
Full Green Field Pre-Commissioning of AC Yard
Testing of All Major Equipment in AC Yard
Testing of Two 13.8kV Switchgear Buildings
Testing of Three 600V OPC Buildings
Testing and Pre-Com of P&C and SAS equipment
Testing and Pre-Com of Building Systems in Two Control Buildings
KCS/RCS HVDC Equipment Commissioning
Location:
Keewatinohk Converter Station/ Riel Converter Station
End User:
Mortenson
Year/ Duration:
2017
Scope of Work:
Full Testing and Commissioning of HVDC Auxiliary Systems Full Testing and Commissioning of HVDC Yard Equipment
KCS/RCS HVDC Equipment Commissioning
Location:
Keewatinohk Converter Station/ Riel Converter Station
End User:
Mortenson
Year/ Duration:
2017
Scope of Work:
Full Testing and Commissioning of HVDC Auxiliary Systems
Full Testing and Commissioning of HVDC Yard Equipment
25KV Breaker Replacement
Location:
BC Hydro Steeples Substation
End User:
BC Hydro
Year/ Duration:
2016
Scope of Work:
Testing and Commissioning of all P&C and SCADA
25KV Breaker Replacement
Location:
BC Hydro Steeples Substation
End User:
BC Hydro
Year/ Duration:
2016
Scope of Work:
Testing and Commissioning of all P&C and SCADA
CBK IT Project
Location:
BC Hydro Cranbrook Substation
End User:
BC Hydro
Year/ Duration:
2016
Scope of Work:
500KV Stand Alone CT replacements12KV-240KV-500KV voltage transformer replacements240KV Dead Tank breaker replacementTesting and Commissioning of all related P&C and SCADA
500KV Stand Alone CT replacements
12KV-240KV-500KV voltage transformer replacements
240KV Dead Tank breaker replacement
Testing and Commissioning of all related P&C and SCADA
West Brooks Station Upgrade Project
Location:
AltaLink West Brooks 28s Substation
End User:
AltaLink
Year/ Duration:
2016
Scope of Work:
Installation, Commissioning, and Acceptance of new Battery Bank SCADA configuration changes to update new alarms to control center Divided entire substation PY and SY PN’s DC loads between the two Battery Banks while maintaining Critical DC Load.
Installation, Commissioning, and Acceptance of new Battery Bank
SCADA configuration changes to update new alarms to control center
Divided entire substation PY and SY PN’s DC loads between the two
Battery Banks while maintaining Critical DC Load.
North Red Deer Station Upgrade
Location:
AltaLink North Red Deer 217s Substation
End User:
SNC
Year/ Duration:
2016
Scope of Work:
Relocation of 138kV line protections Demolition/installation of 4x protection relay modules (311C/311L/D60/L90) Test and Commission relays/CT circuits End to End Testing with Remote Substations
Relocation of 138kV line protections
Demolition/installation of 4x protection relay modules (311C/311L/D60/L90)
Test and Commission relays/CT circuits
End to End Testing with Remote Substations
Bowmanton Station Upgrade
Location:
AltaLink Bowmanton 244s Substation
End User:
ABB/AML
Year/ Duration:
2016
Scope of Work:
Develop grounding plan for 240kV and 138kV substation Installation of protective grounds for substation work
Bowmanton Station Upgrade
Location:
AltaLink Bowmanton 244s Substation
End User:
ABB/AML
Year/ Duration:
2016
Scope of Work:
Develop grounding plan for 240kV and 138kV substation
Installation of protective grounds for substation work
West Brooks Station Upgrade Project
Location:
AltaLink West Brooks 28s Substation
End User:
AltaLink
Year/ Duration:
2015
Scope of Work:
Commissioning new Stand Alone 138kV CT’s Install and Commission new ABB Switchsync F236 POW controller for existing 240kV Shunt Reactor
West Brooks Station Upgrade Project
Location:
AltaLink West Brooks 28s Substation
End User:
AltaLink
Year/ Duration:
2015
Scope of Work:
Commissioning new Stand Alone 138kV CT’s
Install and Commission new ABB Switchsync F236 POW controller for existing 240kV Shunt Reactor
SunnyBrook Station Upgrade Project
Location:
Stoney Plains, ABAltaLink SunnyBrook Substation, Stony Plain, AB
End User:
Allteck/AML
Year/ Duration:
2015
Scope of Work:
Protection and Control Racks Commissioning End to End Testing with Remote Substations SCADA Commissioning Interconnection between 500kV AC and DC Converter Stations.
Stoney Plains, ABAltaLink SunnyBrook Substation, Stony Plain, AB
End User:
Allteck/AML
Year/ Duration:
2015
Scope of Work:
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
Interconnection between 500kV AC and DC Converter Stations.
Rocky Mountain Station Upgrade Project
Location:
AltaLink Rocky Mountain House 262s Substation
End User:
Allteck/AML
Year/ Duration:
2015
Scope of Work:
Commissioning of 2 sets of new Stand Alone 138kV CT’sDemolition and upgrade of existing 138kV Bus Protection to GE-B30 PNInstall and Commission new SEL-2440 SEL status boards
Rocky Mountain Station Upgrade Project
Location:
AltaLink Rocky Mountain House 262s Substation
End User:
Allteck/AML
Year/ Duration:
2015
Scope of Work:
Commissioning of 2 sets of new Stand Alone 138kV CT’s
Demolition and upgrade of existing 138kV Bus Protection to GE-B30 PN
Install and Commission new SEL-2440 SEL status boards
Milo Station Upgrade Project
Location:
AltaLink Milo 356s Substation, AB
End User:
AltaLink/AML
Year/ Duration:
2015
Scope of Work:
Protection and Control Rack Commissioning SCADA Commissioning End to End Testing with Remote Ends
Milo Station Upgrade Project
Location:
AltaLink Milo 356s Substation, AB
End User:
AltaLink/AML
Year/ Duration:
2015
Scope of Work:
Protection and Control Rack Commissioning
SCADA Commissioning
End to End Testing with Remote Ends
Keephills Station Upgrade Project
Location:
AltaLink Keephills 320P Substation
End User:
AltaLink
Year/ Duration:
2015
Scope of Work:
SCADA Commissioning Phase II
Keephills Station Upgrade Project
Location:
AltaLink Keephills 320P Substation
End User:
AltaLink
Year/ Duration:
2015
Scope of Work:
SCADA Commissioning Phase II
Janet Station Upgrade Project
Location:
AltaLink Janet 74s Substation
End User:
Iconic Power
Year/ Duration:
2015
Scope of Work:
240kV Breaker Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning End to End Testing with Remote Substations
240kV Breaker Commissioning
CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
Crossings Station Upgrade Project
Location:
AltaLink Langdon Substation, Crossings, AB
End User:
Allteck/AML
Year/ Duration:
2015
Scope of Work:
Protection and Control Racks Commissioning End to End Testing with Remote Substations SCADA Commissioning Interconnection between 500kV AC and DC Converter Stations.
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
Interconnection between 500kV AC and DC Converter Stations.
500kV & 240 Breaker Commissioning
500kV Transformer Commissioning
500kV CVT/PT/MOD Commissioning
240kV CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations (3 Terminal)
SCADA Commissioning
Strome Station Upgrade Project
Location:
AltaLink Strome 223s Substation
End User:
AltaLink
Subcontracted:
URS Flint
Year/ Duration:
2014/2015
Scope of Work:
138kV Breaker Commissioning Transformer Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning
138kV Breaker Commissioning
Transformer Commissioning
CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
Ware Junction Station Upgrade Project
Location:
AltaLink Ware Junction 132s Substation
End User:
Allteck
Year/ Duration:
2013
Scope of Work:
240kV Breaker Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning SCADA Commissioning
500kV & 240 Breaker Commissioning
500kV Transformer Commissioning
500kV CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
Prentiss Station Upgrade Project
Location:
AltaLink Prentiss 276s Substation
End User:
URS Flint
Year/ Duration:
2013
Scope of Work:
138kV Breaker Commissioning with POW CVT/PT/MOD Commissioning Cap bank Commissioning Protection and Control Racks Commissioning
240kV Breaker Commissioning
CVT/PT/MOD Commissioning
Transformer Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
West Brooks Substation Upgrade
Location:
AltaLink West Brooks 28s Substation
End User:
Allteck
Year/ Duration:
2012
Scope of Work:
Protection and Control Racks Commissioning SCADA Commissioning
West Brooks Substation Upgrade
Location:
AltaLink West Brooks 28s Substation
End User:
Allteck
Year/ Duration:
2012
Scope of Work:
Protection and Control Racks Commissioning
SCADA Commissioning
Westwood Station Upgrade
Location:
AltaLink Westwood 054s Substation
End User:
Allteck
Year/ Duration:
2012
Scope of Work:
25kV & 138kV Breaker Commissioning Transformer Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning
25kV & 138kV Breaker Commissioning
Transformer Commissioning
CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
Tucuman Substation Upgrade
Location:
AltaLink Tucuman 478s Substation
End User:
Allteck
Year/ Duration:
2012
Scope of Work:
25kV Switchgear Commissioning Transformer Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning
138kV & 240kV Breaker Commissioning
Transformer Commissioning
CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Testing
SCADA Commissioning
Picture Butte Station Upgrade
Location:
AltaLink Picture Butte 120s Substation
End User:
AltaLink
Subcontracted:
URS Flint
Year/ Duration:
2012
Scope of Work:
240kV Breaker Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning End to End Testing with Remote Substations
240kV Breaker Commissioning
CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
North Red Deer Station Upgrade
Location:
AltaLink North Red Deer 217s Substation
End User:
Allteck
Year/ Duration:
2012
Scope of Work:
240kV Breaker Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning End to End Testing with Remote Substations
240kV Breaker Commissioning
CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
Nilrem Station Project
Location:
AltaLink Nilrem 574s Substation
End User:
USR Flint
Year/ Duration:
2012
Scope of Work:
25kV & 138kV Breaker Commissioning Transformer Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning
25kV & 138kV Breaker Commissioning
Transformer Commissioning
CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
Natal Substation Upgrade
Location:
BC Hydro Natal Substation
End User:
BC Hydro
Year/ Duration:
2012
Scope of Work:
Protection and Control Racks Commissioning SCADA Commissioning
Natal Substation Upgrade
Location:
BC Hydro Natal Substation
End User:
BC Hydro
Year/ Duration:
2012
Scope of Work:
Protection and Control Racks Commissioning
SCADA Commissioning
Maryville Substation Upgrade
Location:
BC Hydro Maryville Substation
End User:
BC Hydro
Year/ Duration:
2012
Scope of Work:
Protection and Control Racks Commissioning SCADA Commissioning
Maryville Substation Upgrade
Location:
BC Hydro Maryville Substation
End User:
BC Hydro
Year/ Duration:
2012
Scope of Work:
Protection and Control Racks Commissioning
SCADA Commissioning
Long Lake Terminal Substation Upgrade
Location:
BC Hydro Long Lake Terminal Substation
End User:
BC Hydro
Year/ Duration:
2012
Scope of Work:
Protection and Control Racks Commissioning SCADA Commissioning
Long Lake Terminal Substation Upgrade
Location:
BC Hydro Long Lake Terminal Substation
End User:
BC Hydro
Year/ Duration:
2012
Scope of Work:
Protection and Control Racks Commissioning
SCADA Commissioning
Invermere Substation Upgrade
Location:
BC Hydro Invermere Substation
End User:
BC Hydro
Year/ Duration:
2012
Scope of Work:
Protection and Control Racks Commissioning SCADA Commissioning
Invermere Substation Upgrade
Location:
BC Hydro Invermere Substation
End User:
BC Hydro
Year/ Duration:
2012
Scope of Work:
Protection and Control Racks Commissioning
SCADA Commissioning
Joffre Station Upgrade
Location:
AltaLink Joffre 535s Substation
End User:
URS Flint
Year/ Duration:
2012
Scope of Work:
138kV Breaker Commissioning CVT/PT/MOD Commissioning Transformer Commissioning Protection and Control Racks Commissioning
138kV Breaker Commissioning
CVT/PT/MOD Commissioning
Transformer Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
Cassils and Bowmanton Station Upgrade
Location:
AltaLink Cassils 324s and Bowmanton 244s Substation
End User:
Iconic Power Systems
Year/ Duration:
2012
Scope of Work:
138kV & 240kV Breaker Commissioning Transformer Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning
500kV & 240kV Breaker Commissioning
500kV CVT/PT/MOD Commissioning
500kV Transformer Commissioning
Protection and Control Racks Commissioning
End to End Testing with Remote Substations
SCADA Commissioning
138kV & 240kV Breaker Commissioning
CVT/PT/MOD Commissioning
25kV Switchgear Commissioning
Transformer Commissioning
Protection and Control Racks Commissioning
End to End Testing of Relays with Remote End Substations
SCADA Commissioning
138kV Breaker Commissioning
CVT/PT/MOD Commissioning
25kV Switchgear Commissioning
Transformer Commissioning
Protection and Control Racks Commissioning
End to End Testing of Relays with Remote End Substations
SCADA Commissioning
AltaLink Hardisty Upgrade
Location:
Altalink Hardisty, AB
End User:
USR Flint
Year/ Duration:
2011
Scope of Work:
Commissioning if POW breaker and CAP bank CVT/PT/MOD Commissioning Protection and Controls (Brownfield) SCADA Commissioning
138kV & 240kV Breaker Commissioning
CVT/PT/MOD Commissioning
Transformer Commissioning
Protection and Control Racks Commissioning
End to End Testing of Relays with Remote End Substations
SCADA Commissioning
Athalmer and Radium Upgrade
Location:
Athalmer and Radium Substations, BC
End User:
BC Hydro
Year/ Duration:
2011/2012
Scope of Work:
Protection and Control Racks Commissioning SCADA Commissioning
Athalmer and Radium Upgrade
Location:
Athalmer and Radium Substations, BC
End User:
BC Hydro
Year/ Duration:
2011/2012
Scope of Work:
Protection and Control Racks Commissioning
SCADA Commissioning
Peigan Substation Upgrade
Location:
AltaLink Peigan 59s Substation
End User:
Allteck
Year/ Duration:
2010
Scope of Work:
240kV Breaker Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning End to End Testing of Relays with Remote End Substations
240kV Breaker Commissioning
CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Testing of Relays with Remote End Substations
SCADA Commissioning
Fickle Lake Substation Upgrade
Location:
AltaLink Fickle Lake 406s Substation
End User:
Allteck
Year/ Duration:
2010
Scope of Work:
Transformer Commissioning CVT/PT/MOD Commissioning 25kV Switchgear Commissioning Protection and Control Racks Commissioning
138kV & 240kV Breaker Commissioning
CVT/PT/MOD Commissioning
Transformer Commissioning
Protection and Control Racks Commissioning
End to End Testing of Relays with Remote End Substations
SCADA Commissioning
West Brooks Substation Upgrade
Location:
AltaLink WestBrooks 28s Substation
End User:
Allteck
Year/ Duration:
2009
Scope of Work:
Transformer Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning SCADA Commissioning
138kV Breaker Commissioning
CVT/PT/MOD Commissioning
25kV Switchgear Commissioning
Protection and Control Racks Commissioning
End to End Relay Testing with Remote End Substations
SCADA Commissioning
Jenner Substation Upgrade
Location:
AltaLink Jenner 275s Substation
End User:
Allteck
Year/ Duration:
2009
Scope of Work:
240kV Breaker Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning End to End Relay Testing with Remote End Substations
240kV Breaker Commissioning
CVT/PT/MOD Commissioning
Protection and Control Racks Commissioning
End to End Relay Testing with Remote End Substations
SCADA Commissioning
Blackfalds Substation Upgrade
Location:
AltaLink Blackfalds 198s Substation
End User:
Allteck
Year/ Duration:
2009
Scope of Work:
138kV Breaker Commissioning CVT/PT/MOD Commissioning Protection and Control Racks Commissioning SCADA Commissioning