Celanese MV Terminations and Testing

Location:
Edmonton, AB
End User:
Techmation Electric and Controls
Year/ Duration:
2018 / 3 weeks
Scope of Work:
15 KV Terminations and VLF Testing
3 MVA Liquid Filled Transformer and NGR Testing
Overhead Line Demolition
High Voltage Switching Support

Schneider Electric – Arc Flash Mitigation Design, Install & Commission

Location:
Arc Resources - Sunrise 1 & 2
End User:
Schneider
Year/ Duration:
2018
Scope of Work:
Design Arc Flash Mitigation system utilizing SEL-710S
Procurement material and equipment
Site installation
Commissioning & Engineering

Tidewater Resources – Power Quality Study

Location:
Rocky Mountain House, AB
End User:
Tidewater Resources
Year/ Duration:
2018
Scope of Work:
Investigate Motor and VFD failure
Power Quality Study
Engineering report and recommendations

Siemens – Suncor ADW Pre-Commissioning

Location:
Edmonton
End User:
Siemens
Year/ Duration:
2018
Scope of Work:
Pre-Commissioning LV and MV Equipment including switchgear, breakers, relays, transformers and cables
Turnover documentation
Work with Client on DCS

Dynamsyk – MEG Energy Pad DB Pre-Commissioning

Location:
Nisku
End User:
Dynamysk
Year/ Duration:
2018
Scope of Work:
Performed pre-commissioning on LV and HV equipment including transformers, mcc, meters,relays,

Fairmont Jasper Park Lodge – 5 KV Generator Control Investigation

Location:
Jasper National Park
End User:
Fairmont
Year/ Duration:
2018
Scope of Work:
Troubleshoot 5 KV Generator control scheme.
Intermittent

5kV GIS Switchgear Commissioning

Location:
Airdrie, AB
End User:
Dynamysk
Year/ Duration:
2018
Scope of Work:
Pre-Commissioning and Testing of new Siemens 5kV Gas Insulated Switchgear. Feeder and Motor protection relay commissioning

SAGD Plant Commissioning and Start-Up

Location:
Conklin, AB
End User:
Harvest Black Gold
Year/ Duration:
2018
Scope of Work:
Commission 5kV switchgear, motors, MCC’s, cables, transformers, relays
Commission all 600V MCC’s, switchgear, cables
Assist with plant start-up activities such as energization, phasing checks

Cenovus Wembley Plant Commissioning

Location:
Grande Prairie, AB
End User:
Cenovus
Year/ Duration:
2018
Scope of Work:
Perform Quality Control checks on installation of unit
Perform electrical tests on UPS prior to turn up
Turn up and commission UPS alarms and functions test

Enbridge Stone Bridge Terminal

Location:
Edmonton, AB
End User:
Enbridge
Year/ Duration:
2017
Scope of Work:
Ground Resistance Testing for Stone Bridge Terminal expansion

600V and 7.2kV Electrical Building Pre-commissioning and Energization Support

Location:
Warwick Yard, Calgary and Suncor Base Plant
End User:
Clearbakk
Year/ Duration:
2017 (6 weeks), 2018 (2 weeks)
Scope of Work:
Pre-Commissioning and Testing of 7 Electrical Buildings 600V MCCs, E3 Plus Relays, PTs, CTs and 600V-208/120V transformers 7.2kV switchgear, motor contactors, PTs, CTs, power cables and GE Multilin 350 Relays
On-site support at Suncor Base Plant for building energization

Electrical Maintenance Turnaround

Location:
Pengrowth Lindbergh
End User:
Pengrowth
Year/ Duration:
2017
Scope of Work:
Perform annual maintenance on all MV/LV equipment including transformers, circuit breakers, cables, motors, switchgear, protection relays
Coordinate multiple outages and perform switching and grounding

Annual Infrared Survey

Location:
Sherwood Park - Brenntag Canada
End User:
Stratus
Year/ Duration:
2017
Scope of Work:
Perform infrared inspections on LV equipment including transformers, breakers, disconnect switches and panels

Electrical Maintenance Turnaround

Location:
Connacher Algar
End User:
Connacher Oil & Gas
Year/ Duration:
2017
Scope of Work:
Perform annual maintenance on all MV/LV equipment including transformers, circuit breakers, cables, motors, switchgear, protection relays
Coordinate multiple outages and perform switching and grounding

Pembina CBU Phase III Facility Commissioning

Location:
Fox Creek, Godondale, Taylor Tank Farm, Kakwa
End User:
Pembina
Year/ Duration:
2017
Scope of Work:
Commission 25kV Transformers, breakers, switchgear, cables
Commission 5kV Transformers, breakers, switchgear, cables, motors, MCC’s
Commission LV systems including DCS and communications
Assist with plant start-up and integration with utility (Atco)

Leduc 25kV Switchgear Building

Location:
Calgary, AB
End User:
ABB
Year/ Duration:
2016
Scope of Work:
Commission 25kV Switchgear
Test and Commission building services (Fire System, HVAC)

Kineticor Turbine Skids

Location:
Shaunavon, SK
End User:
Kineticor
Year/ Duration:
2016
Scope of Work:
Commissioning of 480V/25kV turbine skid package
Set and testing of 25kV recloser
Integration of turbine signals to switchgear/function testing

CNRL Horizon 72kV Skid Commissioning

Location:
CNRL Horizon Fort McMurray, AB
End User:
ABB
Year/ Duration:
2016
Scope of Work:
72kV Breaker Commissioning
72kV Transformer Commissioning
Commission 4160 switchgear
Commission 4160 Cables

Apache 4160 Switchgear Addition

Location:
Slave Lake, AB
End User:
Apache
Year/ Duration:
2016
Scope of Work:
Installation and Commissioning new 4160 E-House
Commission 4160 switchgear (Breaker, Vacuum Contractors, Cables,Motors)
Commission 4160 Yaskawa VFD
Provide VFD set-up assistance

Annual Substation Electrical Maintenance

Location:
Dawson Creek/Tumbler Ridge
End User:
CNRL
Year/ Duration:
2016-2018
Scope of Work:
Perform maintenance and inspections on 138kV equipmentincluding transformers, breakers, disconnect switches
Perform maintenance testing and inspections on 5kV switchgear
Perform annual oil and gas analysis

Arc Flash Relay Upgrade

Location:
Suncor Base Plant
End User:
Suncor
Year/ Duration:
2016
Scope of Work:
Retrofit multiple 13.8kV – 25kV switchgear with new SEL-751A relays with arc flash detection capabilities commissioning of protections and arc flash scheme

Rio Tinto Alcan Upgrade

Location:
Kitimat, BC
End User:
ABB/Bechtel
Year/ Duration:
2015
Scope of Work:
5kV Breaker Commissioning
5kV Transformer Commissioning
5kV CVT/PT/MOD Commissioning
25kV Breaker Commissioning

Jenner Oil Battery Upgrade

Location:
Jenner, AB
End User:
Cardinal Energy
Year/ Duration:
2014
Scope of Work:
Commission Co-Gen
Assist and consult on start-up

CNRL Horizon Major Projects Mines Upgrade

Location:
Fort McMurray, ABCNRL Horizon Fort McMurray, AB
End User:
CNRL
Year/ Duration:
2014
Scope of Work:
5kV switchgear and breaker maintenance
13.8kV switchgear and breaker maintenance
Protection and Control commissioning
Transformer Commissioning

STP Southern Pacific Upgrade

Location:
STP Southern Pacific, AB
End User:
Southern Pacific
Subcontracted:
Drifter/AMEC BDR
Year/ Duration:
2012
Scope of Work:
5kV switchgear and breaker commissioning
13.8kV switchgear and breaker commissioning
Protection and Control Racks Commissioning
Transformer commissioning

Suncor Wheatland Wind Upgrade

Location:
Suncor Wheatland Wind IPP, AB
End User:
Suncor/Hatch
Year/ Duration:
2011
Scope of Work:
Commissioning of 138kV breakers
Transformer commissioning
35kV GIS switchgear
Protection and Control Racks Commissioning

Connacher 2011 Maintenance

Location:
Connacher Oil and Gas, AB
End User:
Connacher Oil & Gas
Year/ Duration:
2011
Scope of Work:
5kV switchgear and breaker maintenance
13.8kV switchgear and breaker maintenance
Protection and Control Racks Commissioning
Transformer Maintenance

Shell AOSP Project

Location:
Shell AOSP Project, AB
End User:
Allteck
Year/ Duration:
2010
Scope of Work:
Commissioning of 138kV breakers
Protection and Control Racks Commissioning
CVT/PT/MOD Commissioning
End to End testing with remote substations

Connacher Upgrade

Location:
Connacher Oil & Gas, AB
End User:
AMEC BDR
Year/ Duration:
2010
Scope of Work:
5kV Switchgear and Breaker Commissioning
13.8kV Switchgear and Breaker Commissioning
Protection and Control Racks Commissioning
Transformer Commissioning

Pengrowth 480V MCC & NGR Testing

Location:
Lindbergh, AB
End User:
Scovan Engineering Inc
Year/ Duration:
July 2018
Scope of Work:
480 V MCC Commissioning
NGR Testing
PQM Meter Setup
Energization Support

Meritage 480V MCC & NGR Testing

Location:
Grande Prairie, AB
End User:
Meritage Midstream
Year/ Duration:
July 2018
Scope of Work:
480 V MCC Commissioning
NGR Testing
PQM Meter Setup
Energization Support

Pembina 5kV Motor Protection Upgrades

Location:
Grande Prairie, AB
End User:
Pembina
Year/ Duration:
July - August 2018
Scope of Work:
Completed Engineering and Design work for new IED protection setting and drawing development
Fabrication and Pre-commissioning of new MCC Doors complete with upgraded protections